News

News

Product Categories

contact us

Zhangjiagang Aman Machinery Co., Ltd.

Contact: Mr Mike Liu

Email:liulvkuan@163.com

Friendship9999@126.com

Cellphone:0086-13962478740(WhatsApp)

Skype: Mikeliu78

Website:http://www.kauku.cn/en/

Address:Zhangjiagang Economic Development Zone Zhenxing Road, Liang Feng Machinery Industrial Park, block C



[about:title]

Your current location: Home > News > Company news

What are the inspection work before the plastic machine running?

Release date:2023-11-09 Author: Click: 131

Mechanical blow molding machine is the fixed assets of the enterprise, our operating personnel in the machine before running to do related preparatory work, so as to better maintenance of the machine, make the machine performance to maximize efficiency. Today Xiaobian talk to you about what we do inspection work

First: each class to open plastic and plastic machinery, must be in the various parts of the oil slick. (manipulator, manipulator, rail clamping rail) before consumption check all moving parts can be strong, screw loosening body, especially the central strong impact, whether the local anomaly belt drive.

Second: plastic plastic mold must be cleaned regularly, polishing. Open the switch pressure source when the necessary slow action, to prevent air flow too fast dirt blown into the electromagnetic valve, and open the exhaust valve to ensure clean air for 30 seconds.

Third: check the lamp can damage, fracture. Timely change. Check the pneumatic components can leak, the action can be flexible. Three check whether CIS abnormal leakage, whether infarction, glass water storage can too full. Plastic plastic mechanical solenoid valve in case of abnormal, timely cleaning.

Fourth: the swing arm three days to four days at a time. Heating machine chain and the small chain can be once a month. Check the main reducer, heating machine reducer can be short of oil. Main bearing can be (2 - 3) plus a month.

Fifth: check the high-pressure gas source, low pressure gas source, power supply, water can be normal. Check the emergency stop switch, safety door switch, maintain the installation test switch is normal.

Sixth: check the temperature head into the embryo, the embryo can work properly. If the embryo is not in place, the pressure can be adjusted to install nuts.

The above is the detailed parts inspection, the use of life depends on good machine to the machine itself also depends on the quality of personnel practices and technology, this is not good grasp, some operators often change machine accessories, some operators in the machine parts is relatively small. So I hope we can take care of our machines as much as we love our eyes.

在线客服
分享